The main tasks carried out during the season were:
1.Completing plans, sections, elevations and architectural details of standing structures where additional information was required to compliment what had been done in 2002.
2.Cleaning vegetation (after receiving expert botanical advice from the Wild Life Trust) and debris to expose wall faces, foundations, emplacements and other features (using workmen, under close supervision, for heavy work).
3.Clearing the selected areas of the Upper Battery and Central Platform by removing the accumulated wind blown sand to reveal more of the structures.
4.Adding to the photographic record (slide, negative and high resolution digital media) including photographs with measured control points for photo-rectification
5.Starting a catalogue of the 19and 20 century graffiti (mostly made by British soldiers), including photography, hand drawings, tracings and some squeezes (paper impressions).
6.Experimentation in repointing masonry and replacing fallen stones in their original